Schneider Electric to Upgrade DP World’s Sokhna Basin 2

Schneider Electric has been chosen by DP World, a number one enabler of world commerce, to implement an end-to-end good vitality MV, LV distribution system at DP World’s Sokhna Basin 2 Terminal, located close to the southern entrance to the Suez Canal on the Red Sea.

The resolution will enhance security, save on electrical energy and upkeep prices, and cut back carbon emissions at certainly one of Egypt’s largest ports.

The EcoStruxure Power resolution is Internet-Of-Things-enabled, which is able to enable DP World to run quite a lot of digital functions, analytics and different applied sciences throughout the system, to additional enhance operations and guarantee enterprise continuity.

The full set up will embody each {hardware} and software program to handle, monitor and optimize the facility throughout Basin 2’s electrical distribution community.

The system will give DP World Sokhna’s workers, each these on-site in addition to individuals working remotely, full management of the facility grid at Basin 2, and be certain that {the electrical} system is functioning as much as the highest acknowledged worldwide requirements, so operations can run easily.

DP World Sokhna Expansion Nears Completion

Predictive upkeep will assist cut back downtime at Basin 2, guaranteeing higher effectivity of DP World’s property and cut back operational prices.

DP World’s Sokhna’s location on the Red Sea, just under the southern entrance to the Suez Canal, is ideally suited to deal with cargo transiting by means of one of many world’s busiest business waterways which facilitates commerce between East and West.

The growth of Basin 2 on the port has been developed at a price of $520 million, taking DP World’s complete investments in Egypt to $1.6 billion.

Suhail Al Banna, CEO and Managing Director of DP World Middle East and Africa, mentioned: “We have a forward thinking and long-term approach to developing infrastructure, and therefore we invest in smart technology and innovations.”

Once operational, DP World’s complete dealing with capability on the Sokhna port will virtually double to 1.75 million TEU, from a present 970,000 TEU.

Basin 2 features a 1,300-metre quay with further 750 meter already in use in Phase 1, and a 350,000 sq. metre container yard. It can even hyperlink two operational basins within the port as one entity.

“Once this project is completed, the DP World’s Sokhna Basin 2 terminal will be the most technologically advanced port in Egypt,” mentioned Walid Sheta, Schneider Electric’s Cluster President, North East Africa and Levant.

Read More: DP World Sokhna Operating at Unprecedented Levels

LEAVE A REPLY

Please enter your comment!
Please enter your name here